Pauline Johnson Elementary received a full remediation to 2/3 of the exterior. Our scope for this project included the rain screen system and stucco for this over 90 year old school. We also replaced the decaying brick base with a tumbled full brick to match the remaining structure. This was accomplished while school was in session for the entire project. Completed Feb 2014.
This renovation was a mix of finishes and a coordination challenge with the mall remaining open. The scope of work here included steel framing, resheathing, rain screen assembly , brick installation , stucco repairs and a new product called Longboard. Currently under renovation February 2014.
This building in Calgary we completed using the Knight Wall System. Stucco repairs for window and door replacement incorporated with a brick veneer being used to reduce exterior finish weight. Completed August 2013.
Westminister Landing in New Westminister Quay was a large full remediation encompassing numerous phases. This project included Hardie plank and shingle. Access for residents needed to be maintained with their safety paramount. Completed March 2013.
Contact us today for a free estimate.
Phone Number: (604) 855-8707
Fax Number: (604) 855-8919
E-mail: info@bjplastering.com